Product Categories

Schlee (China) Refrigerating Equipment Manufacturing Co.,Ltd

Add:Jupu Road, Pukou Development Zone, Nanjing City, Jiangsu Province, China

Contact us:Annie

Tel:+86-25-66615565

Fax:+86-25-84485651

Mob:+86-18013811852

E-mail:world@chinaschlee.com

Web Site:www.schleechiller.com

Home > News > Content
Repair And Maintenance
- Dec 02, 2016 -

Chiller's open and shut down air conditioning in order to ensure that the host starts running, you must ensure:

① condenser cooling good, otherwise they will be in the cold-curing temperature and corresponds to the condensing pressure is too high, cold water unit high pressure protection device and parking, and even lead to failure.

② evaporator in cold water circulation, otherwise they will be in the cold water temperature is low, leading to cold water temperature protection device stopping or low evaporation temperature and the evaporation pressure, low voltage protection devices is chiller stopped, or even cold water freezing in the evaporator and damage equipment. Therefore, the chiller boot sequence as: (must be strictly adhered to) open--> cooling water pump of cooling tower fan--> open open open chiller--> chiller chilled water pumps shut down the order: (must be strictly adhered to) chillers to stop--> stop--> stop--> cooling water pump of cooling tower fan cooling water pump stops

Matters needing attention

① When the machine stops, chillers should be at the end of half an hour before the close, cold water pumps shut down again after work, to save energy and avoid downtime, protect the unit.

② prior to running the refrigeration cycle, should confirm that the heating cycle valve is fully closed.


Previous: Operation Flow