Water-cooled half-seal screw-type chiller is a kind of central air-conditioning product, which is cooling medium. Compared with the same cold air cooling unit, because of its condenser and evaporator are made of special efficient heat transfer tube, so compact structure, small size, Water Cooled Screw Chiller high efficiency, and because there is no condensation fan, and thus low noise.

In the water-cooled half-seal screw chillers manufacturing has a mature technology, perfect technology and advanced testing equipment, Water Cooled Screw Chiller coupled with the selection of international first-class accessories, to ensure the unit's stable and efficient operation.

Water-cooled semi-closed screw chillers can provide cold water for the central air-conditioning system of hotels, hospitals, pharmaceutical factories, theaters, gymnasiums, entertainment centers, commercial buildings, industrial and mining enterprises, etc., Water Cooled Screw Chiller and also provide refrigeration for textile, chemical, food, electronics and scientific research departments.

1, the unit should be dedicated room, Water Cooled Screw Chiller and should take measures to the unit running heat generated from the room, ventilation can maintain room temperature does not exceed 35 Shan requirements.

2, the unit should be installed on the rigid base or concrete foundation, the foundation should be surface formation, should be able to withstand the unit operation weight.

3, the unit base around should be sufficient discharge capacity drainage measures such as drains, in order to stop the seasonal operation or maintenance of the system in the discharge of water.

4, the room should have enough space for the installation and maintenance of the unit, the room should have enough space to unplug, at the same time should not be installed above the compressor pipe and line pipe.

5, it is recommended that the installation of water pipe and the unit to take over the size of the load-isolating rubber to take over the spacing, Water Cooled Screw Chiller so that the unit to arrive at the scene after the appropriate construction and adjustment space.

6, in order to make the electrical components work properly, do not put the unit in the dust dirt, corrosive smoke and humidity of the place, if such a situation exists, must be corrected.

7, the materials and tools should be prepared: soft joints, Water Cooled Screw Chiller shockproof cushion, hoisting equipment, hoisting beams, hanging chain, Jack, sliding mat wood, pad roll, crowbar.

1. The unit has been strictly packaged and inspected before leaving the factory, to ensure that the unit under normal conditions to reach the destination, the installer, the carrier and the hoisting of the same protection unit, to eliminate the brutal operation and damage the unit, Water Cooled Screw Chiller special attention not to some angle valve, pipe collision to avoid leakage of refrigerant.

2. The Unit should maintain the level in the moving movement, do not tilt, can use the crane, use the crane must use the hoisting sign bottom hanging ear, the sling and the unit contact part should have the support material isolation. The slings shall be able to withstand the weight of the whole unit, Water Cooled Screw Chiller or it will cause damage to the unit or serious personal injury. Do not lift or move the unit with a forklift.

3. If you do not have vertical lifting conditions, you can use the horizontal rolling method, that is, the two ends of a certain height with a jack, the pad rolling in the unit sliding mat wood bearing, the unit rolling in place, and then remove the sliding pad wood. When moving the unit using the horizontal rolling method, the force can only be used on the rack or sliding pad.

When the unit is in place, remove the sliding mat wood, calibrate the level with the bubble level instrument, and anchor the bottom foot on the base of the base bolt. Water Cooled Screw Chiller It is recommended to place a 15 20mm thick shockproof cushion between the base foot and the foundation.

The unit is generally installed in the basement or the bottom or special room. If it is necessary to install in the higher floor, the first should be sure whether the floor structure can withstand the operation of the unit weight, when necessary to strengthen the floor, in addition, the level of the floor should be accurate; it is recommended to place the shock absorber according to the unit Operation weight distribution。